Is it possible to make changes in both the database calendar and the Outlook calendar while using Load All / Store All?
My problem is this:
I have Load All / Store All set for calendar. If I move a calendar appointment in Outlook and then the sync runs, the Load All will get the original appt from the database and move my changed appointment back to it's original time in Outlook. I don't want to switch to Store All / Load All since most of the calendar work is done in the database. Is there a solution for this?